For Sale: Modern Apartments in Zakaki, Limassol – New Residential Complex
For Sale
Features
Details
City:
Zakaki
Bedrooms:
1
Covered Parking:
1
Floors Building:
3
Construction Year:
2025
Areas
Internal area sqm:
50m²
Covered Verandas:
12m²
Energy
Energy Efficiency Grade:
A
Main Features
Secure Door:
Walk-in Wardrobe:
Luxury Fittings:
Veranda Covered:
Double Glazing:
Door Phone:
Pressurized Water System:
City View:
Elevator:
Storage Space:
Description
Introducing an exclusive new residential complex in the scenic Zakaki area of Limassol, offering a limited selection of just 6 modern apartments in a contemporary 3-storey building. Each apartment features 1 or 2 spacious bedrooms, with internal areas ranging from 50.09 m² to 83.15 m² and covered verandas between 12.13 m² and 23.79 m².
These apartments are designed for comfort and energy efficiency (Class A), with features such as double-glazed windows, A/C, solar heating panels, provision for underfloor heating, and built-in wardrobes. Each unit includes private parking, storage , and is located within a gated, secure complex for added privacy and peace of mind.
The third-floor apartments offer exceptional added value, with private rooftops, gardens, and BBQ areas, providing the perfect space for relaxation or entertaining while enjoying stunning city views.
Prices start from €205,000, with penthouse priced at €370,000. The project is expected to be completed by the end of 2025.
These apartments are designed for comfort and energy efficiency (Class A), with features such as double-glazed windows, A/C, solar heating panels, provision for underfloor heating, and built-in wardrobes. Each unit includes private parking, storage , and is located within a gated, secure complex for added privacy and peace of mind.
The third-floor apartments offer exceptional added value, with private rooftops, gardens, and BBQ areas, providing the perfect space for relaxation or entertaining while enjoying stunning city views.
Prices start from €205,000, with penthouse priced at €370,000. The project is expected to be completed by the end of 2025.